budget-creation

Complete budgeting and forecasting workflow covering annual budgets, departmental budgets, rolling forecasts, and variance analysis. Delivers documented budgets with approval trails.

LerianStudio☆ 86 Repository stars10 Repository forks

Installation

Follow the repository instructions for this skill and your agent. Review the files and dependencies before adding it to your workflow.

View source ↗Guides

Skill instructions

Budget Creation Workflow

This skill provides a structured workflow for comprehensive budget development using the budget-planner agent.

Workflow Overview

The budget creation workflow follows 6 phases:

Phase Name Description
1 Planning Define budget scope, methodology, timeline
2 Assumption Development Document all budget assumptions
3 Line Item Build Build detailed budget by line item
4 Consolidation Consolidate and review totals
5 Approval Obtain required approvals
6 Documentation Finalize with version control

Phase 1: Planning

MANDATORY: Define budget parameters before building

Questions to Answer
Question Purpose
What is the budget period? Sets time scope
What methodology will be used? Incremental vs ZBB
Who are the budget owners? Establishes accountability
What is the timeline? Sets deadlines
What are the constraints? Defines boundaries
Methodology Selection
Method When to Use Characteristics
Incremental Stable operations Prior year + adjustments
Zero-Based Cost reduction Every item justified
Driver-Based Scalable operations Tied to activity drivers
Top-Down Corporate targets Allocate from total
Bottom-Up Department input Aggregate from detail
Blocker Check

If ANY of these are unclear, STOP and ask:

  • Budget period
  • Methodology choice
  • Approval requirements
  • Timeline constraints

Phase 2: Assumption Development

MANDATORY: Document ALL assumptions before building

Required Assumptions
Category Examples
Revenue Growth rate, pricing, volume
Headcount Hiring plan, attrition, merit
Inflation General inflation, specific items
Timing Seasonality, project timing
Strategic Initiatives, investments
Assumption Documentation Standard
Element Requirement
Assumption statement Clear, specific description
Value Quantified assumption
Rationale Why this assumption
Owner Who owns this assumption
Sensitivity Impact if wrong
Anti-Rationalization
Rationalization Why It's WRONG Required Action
"Same as last year" Each budget is independent RE-EVALUATE assumption
"Industry standard" Industry varies CITE specific basis
"Conservative estimate" Conservative needs quantification DEFINE conservatism

Phase 3: Line Item Build

Dispatch to specialist with full context

Agent Dispatch
Task tool:
  subagent_type: "ring:budget-planner"
  model: "opus"
  prompt: |
    Build budget per these specifications:

    **Period**: [budget period]
    **Type**: [annual/departmental/project]
    **Methodology**: [from Phase 1]

    **Assumptions**:
    [From Phase 2]

    **Constraints**:
    [Any targets or limitations]

    **Prior Period Reference**:
    [Attach prior budget/actuals]

    **Required Output**:
    - Line item detail with owners
    - Assumption linkage for each item
    - Variance to prior period
    - Monthly/quarterly phasing
Required Output Elements
Element Requirement
Budget Summary High-level totals
Line Item Detail Every line with owner
Assumptions Linked to line items
Phasing Monthly or quarterly
Variance To prior period/target
Version Version number and date

Phase 4: Consolidation

MANDATORY: Review consolidated budget for reasonableness

Consolidation Checks
Check Validation
Math accuracy All totals foot and cross-foot
Assumption consistency No conflicting assumptions
Intercompany Eliminations if applicable
Completeness All departments included
Reasonableness Tests
Test Validation
YoY change Explainable variance
Margin trends Consistent with strategy
Headcount Reconciles to HR plan
CapEx Within investment guidelines

Phase 5: Approval

MANDATORY: Document all approvals

Approval Workflow
Level Approver Documentation
Department Department head Written approval
Finance Controller/CFO Written approval
Executive CEO Written approval
Board Board/Committee Meeting minutes
Approval Documentation
Element Requirement
Approver name Full name and title
Approval date Specific date
Version approved Version number
Conditions Any conditions or caveats

Phase 6: Documentation

MANDATORY: Finalize with full audit trail

Documentation Checklist
Element Status
All assumptions documented Required
All line items with owners Required
All approvals documented Required
Version control in place Required
Change log complete Required
Output Format

See shared-patterns/execution-report.md for base metrics.

Budget-Specific Metrics:

  • line_items: N
  • departments: N
  • assumptions_documented: N
  • variance_to_prior: X.X%
  • approval_status: DRAFT/SUBMITTED/APPROVED

Pressure Resistance

See shared-patterns/pressure-resistance.md for universal pressures.

Budget-Specific Pressures
Pressure Type Request Agent Response
"Make the numbers work" "Budgets must reflect realistic projections. I'll document achievable targets."
"Skip departmental review" "All budgets require owner sign-off. I'll coordinate with departments."
"Use last year's assumptions" "Each budget needs fresh assumption validation. I'll re-evaluate all assumptions."
"We need it by EOD" "Quality cannot be compromised by timeline. I'll document what's achievable."

Anti-Rationalization Table

See shared-patterns/anti-rationalization.md for universal anti-rationalizations.

Budget-Specific Anti-Rationalizations
Rationalization Why It's WRONG Required Action
"Just add X% to last year" Every item needs justification JUSTIFY each item
"Department requested it" Requests need validation VALIDATE request basis
"We always spend this much" Historical ≠ justified JUSTIFY current need
"Round number is close enough" Precision matters USE calculated amounts

Execution Report

Upon completion, report:

Metric Value
Duration Xm Ys
Line Items N
Departments N
Assumptions N documented
Approval Status DRAFT/APPROVED
Result COMPLETE/PARTIAL
Quality Indicators
Indicator Status
All assumptions documented YES/NO
All items have owners YES/NO
All approvals obtained YES/NO
Version control in place YES/NO

Examples

Read the usage examples in the source repository.

View source ↗

Source history

Indexed on
2026-01-20
Index updated
2026-02-04
Branch
main

Index and sync dates describe this directory. View the source repository for code history.

GitHub ↗

chat Comments (0)

chat_bubble_outline

No comments yet. Be the first to share your thoughts!