Search

PythonReactSEOPDF
OpenClaw

olo-dcf-valuation

DCF valuation methodology for M&A due diligence — projections, sensitivity analysis, and terminal value calculation

aniebyl0 source installs☆ 0 Repository starsv1.0.0

Installation

Follow the repository instructions for this skill and your agent. Review the files and dependencies before adding it to your workflow.

SkillHub CLI

skillhub install aniebyl/olo-dcf-valuation

Inspect the source and compatibility requirements, then follow its installation steps.

Give your agent the source link and ask it to inspect instructions and dependencies before explaining the installation steps.

View source ↗Guides

Skill instructions

DCF Valuation for M&A Due Diligence

Build discounted cash flow models for target company valuation in M&A contexts.

Unit System (Critical)

  • Storage: Absolute dollars (raw financial data)
  • Calculation: Millions (DCF models expect this)
  • Display: Smart formatting (B/M/K based on magnitude)
  • Never pass raw stored values directly into DCF calculations without unit conversion

Validation Before Calculation

  1. Verify base revenue exists and is non-zero
  2. Confirm WACC is between 5-25% (flag outliers with explanation)
  3. Terminal growth must be less than WACC (Gordon Growth Model constraint)
  4. Projection period: 5-10 years (default 5)
  5. Verify EBITDA margins are within plausible industry range

Default Assumptions

Parameter Default Rationale
Tax rate 21% (US) / 17% (SG) Adjust per jurisdiction
CapEx as % of revenue 5% Adjust per industry (SaaS ~3%, manufacturing ~8-12%)
Terminal growth 2.5% Should not exceed long-term GDP growth
WACC CAPM-calculated Fallback: 10-12% for mid-market
Depreciation % of CapEx Match to industry capital intensity
Working capital change % of revenue delta Use historical average if available

WACC Calculation (CAPM)

Cost of Equity = Risk-Free Rate + Beta × Equity Risk Premium
WACC = (E/V × Cost of Equity) + (D/V × Cost of Debt × (1 - Tax Rate))
  • Risk-free rate: 10-year Treasury yield
  • Equity risk premium: 5-7% (Damodaran)
  • Beta: Use comparable public companies, unlever/relever for target capital structure
  • Size premium: Add 2-4% for small/mid-market targets

Projection Methodology

  1. Revenue: Start from last reported, apply growth rates (declining toward terminal)
  2. EBITDA: Apply margin assumptions (converge toward industry median)
  3. Free Cash Flow: EBITDA - Taxes - CapEx - Change in Working Capital
  4. Terminal Value: Gordon Growth Model or Exit Multiple method
  5. Discount: Apply WA...

Source information

Source
github
Repository
openclaw/skills
Path
skills/aniebyl/olo-dcf-valuation
Version
1.0.0
Commit
210918aff94a2094c9108b6395568457770f437e
Classification source
rules
Status
active
Visibility
public

These signals come from indexed source analysis and may lag behind changes. Check the current source files.

Extracted content

SKILL.md
# DCF Valuation for M&A Due Diligence

Build discounted cash flow models for target company valuation in M&A contexts.

## Unit System (Critical)

- **Storage**: Absolute dollars (raw financial data)
- **Calculation**: Millions (DCF models expect this)
- **Display**: Smart formatting (B/M/K based on magnitude)
- Never pass raw stored values directly into DCF calculations without unit conversion

## Validation Before Calculation

1. Verify base revenue exists and is non-zero
2. Confirm WACC is between 5-25% (flag outliers with explanation)
3. Terminal growth must be less than WACC (Gordon Growth Model constraint)
4. Projection period: 5-10 years (default 5)
5. Verify EBITDA margins are within plausible industry range

## Default Assumptions

| Parameter | Default | Rationale |
|-----------|---------|-----------|
| Tax rate | 21% (US) / 17% (SG) | Adjust per jurisdiction |
| CapEx as % of revenue | 5% | Adjust per industry (SaaS ~3%, manufacturing ~8-12%) |
| Terminal growth | 2.5% | Should not exceed long-term GDP growth |
| WACC | CAPM-calculated | Fallback: 10-12% for mid-market |
| Depreciation | % of CapEx | Match to industry capital intensity |
| Working capital change | % of revenue delta | Use historical average if available |

## WACC Calculation (CAPM)

```
Cost of Equity = Risk-Free Rate + Beta × Equity Risk Premium
WACC = (E/V × Cost of Equity) + (D/V × Cost of Debt × (1 - Tax Rate))
```

- Risk-free rate: 10-year Treasury yield
- Equity risk premium: 5-7% (Damodaran)
- Beta: Use comparable public companies, unlever/relever for target capital structure
- Size premium: Add 2-4% for small/mid-market targets

## Projection Methodology

1. **Revenue**: Start from last reported, apply growth rates (declining toward terminal)
2. **EBITDA**: Apply margin assumptions (converge toward industry median)
3. **Free Cash Flow**: EBITDA - Taxes - CapEx - Change in Working Capital
4. **Terminal Value**: Gordon Growth Model or Exit Multiple method
5. **Discount**: Apply WA...

Related skills

OpenClaw

x402hub

capncoconut

Register, communicate, and earn on the x402hub AI agent marketplace. Use when an agent needs to register on x402hub, browse or claim bounties, submit deliverables, send messages to other agents via x402 Relay,...

OpenClaw

claw

capevace

Real-time event bus for AI agents. Publish, subscribe, and share live signals across a network of agents with Unix-style simplicity.

OpenClaw

captchas-openclaw

captchasco

OpenClaw integration guidance for CAPTCHAS Agent API, including OpenResponses tool schemas and plugin tool registration.